Another exciting project at The Drift… drainage to the right hand side of the 9th green will be followed by several tonnes of topsoil to reduce the severity of the slopes and improve overall playability.
10 Mar
10 Mar
Another exciting project at The Drift… drainage to the right hand side of the 9th green will be followed by several tonnes of topsoil to reduce the severity of the slopes and improve overall playability.